Hülsenbusch Apparatebau

References: Erection

 

Client

Country

Performance profile

TEAtherm

D

Calculation, manufacturing and erection of a vacuum condenser for the Dinkelsbühl BMHKW TEAtherm

TEAtherm

D

Calculation, manufacturing and erection of 2 steam converters for the Dinkelsbühl BMHKW TEAtherm

TEAtherm

D

Manufacturing and erection of ECO 1+2 for the Dinkelsbühl BMHKW TEAtherm

TEAtherm

D

Manufacturing and erection of pipe-protecting shells for superheater 1-3 for the Dinkelsbühl BMHKW TEAtherm

STEAG

D

Dismantling and re-erection of an injection cooler for the Großaitingen STEAGBMHKW

STEAG

D

Manufacturing and erection of superheater 1+2 for the Großaitingen STEAGBMHKW

STEAG

D

Manufacturing and erection of pipe-protecting shells for ECO 1-3 for the Großaitingen STEAG BMHKW

AWB

D

Dismantling and re-erection of superheater 4 in the Weißenhorn MHKW

Avea

D

Calculation, manufacturing, dismantling and re-erection of a 3-stage steam luvo for the Leverkusen MHKW Avea

Emschergenossenschaft

D

Calculation, manufacturing, dismantling and re-erection of ECO 1+2 the fuidized-bed furnaces 1+2 of the Bottrop Emschergenossenschaft

BIO HKW

D

Manufacturing and erection of superheater 3 for the Herbrechtingen BIO HKW

div. Betreiber

D

General check work / internal boiler checks

Everris

NL

Replacement of the inside shell of the TNV system

Status: 05.2014